The Business Continuity Plan is a living document, tested and understood across the organisation by all its stakeholders. In summary, the following steps can be followed to implement the Business Continuity Plan in accordance with ISO 22301:

1. Define the protected elements

The first consideration when implementing the Business Continuity Plan is which elements are essential for the business to function. These are the company's “protected elements” and the focus for which the Continuity Plan must establish an alternative or specific action if something goes wrong.

2. Review protection levels

Establish the minimum service level to be achieved when a protected element fails, in order to maintain business continuity.

For example, when implementing the Business Continuity Plan, the protected element may be the company's headquarters, which has become unusable because of a flood. To enable staff to continue working, a fully prepared alternative location is essential, or simply a remote working solution that allows staff to resume their tasks remotely.

Identify exactly what is needed to keep systems operational: a cloud backup from which to restore key files and databases, or a complete replica of the entire infrastructure.

For systems, also define a “recovery point objective” (RTO in the source), meaning the amount of data loss considered tolerable; and a “recovery time objective”, or RTO, the maximum time a disaster can leave the business inoperative.

3. Identify protection requirements

Once it is clear what must be protected and to what extent, define exactly what is needed to achieve these protection levels and how the people, premises and related systems are involved.

Continuing the example of implementing the Business Continuity Plan for a flooded head office: if a second office is required, determine the maximum distance to the alternative location, whether all staff or only some should relocate, and which internal systems they should be able to access.

4. Failure scenarios and actions

To determine protection requirements, define the possible failures of each protected element. Any failure activates the Business Continuity Plan. The plan must specify actions to restore the required level of protection.

Returning to the office example, anything that makes the building unusable, such as fire or flooding, should be considered a failure scenario. For each scenario, define actions to restore the required level of protection, such as having a fully prepared second office. These may be as simple as calling the tenant of the second location to announce activation of the Business Continuity Plan.

5. Roles and responsibilities

When planning actions for each failure scenario, specify not only the steps to follow but also the roles and responsibilities of those who must carry them out. These can be integrated into the job descriptions associated with the ISO 9001 certificate.

In this example, the roles may include:

  • Facilities manager: informs the owner of the secondary office that the Business Continuity Plan has been activated.
  • IT team: transports and configures equipment and systems at the secondary location so staff can work.
  • Human Resources: coordinates internal communications and ensures all workers know what is happening and can return to work as soon as possible.

6. Rollback

After a failure scenario occurs, the objective is to restore full business operations. Returning to a minimum operating level as quickly as possible is often critical for companies.

To achieve this, a rollback system is needed to return all systems and processes to their last functioning state and restore operations. This approach is often more cost-effective than maintaining a complete replica of the primary operating model ready for use if it fails, although the latter clearly provides greater assurance.

7. Testing

This is the most critical element of any Business Continuity Plan. It demonstrates that the plan is understandable, reliable and effective. A full Business Continuity Plan exercise is normally conducted every two years. In any case, testing each protected element at least once a year is recommended.